Salisbury Pond Bench-Scale Study Results

The results of a benchscale study evaluating the feasibility of Salisbury Pond dredging. The purpose of the study was to better understand the sediment characteristic and simulate dredging and dewatering techniques methods to reduce disposal weight. Reduced sediment mass and water weight will reduce transport and disposal costs that, based on arsenic-impacts to sediment, are high.